Colin Lee MacLeod — More Better Good
MENU ☰

China Hat Rescue — Fixing the Uplift at the Fish Farm

The Curse of the Deckhand

China Hat Rescue

Fixing the uplift at the fish farm.

The Story

The job Colin described had a clear goal: recover the China hat, inspect the uplift system, repair what needed attention, and work toward getting the pen back online.

In Colin’s description of this farm’s setup, the China hat sits at the bottom of the pen as part of the uplift system. Compressed air is sent through the system so morts can be lifted from the bottom and moved toward the collection point.

It sounds simple in one sentence. In the real world it means hoses, retrieval lines, fittings, wet gear, slippery surfaces, crane support, and a crew trying to keep the operation moving.

What Is a China Hat?

The components below describe Colin’s working setup; they are not an equipment specification or lifting diagram.

Air line
Compressed air from the farm system.
Retrieval line
Long line used to recover the hat.
Tigerflex
Heavy flexible hose in the lower system.
Layflat
Flexible discharge hose higher in the system.
China hat
Lower uplift component at the pen.
Collector
Where recovered morts are gathered.

The Job — What the Work Involves

An overview of the work Colin described, not a sequence to follow. The responsible crew directs the actual work under vessel, farm and equipment procedures.

  • Planning includes the recovery arrangement and preparation of the work area.
  • Recovery brings the lower gear to a place where the crew can inspect it.
  • Inspection concerns the hoses, fittings and connection points.
  • Repair decisions depend on what the crew finds.
  • Reinstallation is a separate part of the job, directed by the responsible crew.
  • Return to service depends on the crew’s checks of the uplift and collection system.

Original photographs from the farm: location and equipment context, rather than a frame-by-frame record of the recovery.

Walkway between net-covered fish pens, with a green building and mountains beyond
Real photo: a walkway between fish pens.
Stern of Aqua Service beside the farm walkway, with crane equipment visible
Real photo: Aqua Service beside the farm.
Green rope and metal fitting over the water beside a metal farm walkway
Real photo: a rope and metal fitting at the walkway edge.
Coiled green rope on a farm walkway with yellow buoys and water beyond
Real photo: coiled rope on a walkway, with buoys beyond.

Key Vocabulary — On the Farm

  • China hat — lower uplift component
  • uplift — air-powered system bringing morts upward
  • mort — a dead fish
  • Tigerflex — heavy flexible hose
  • layflat — flexible discharge hose
  • retrieval line — line used to recover gear
  • collector — pen-level collection point

Useful English — On Deck

Language practice, not an instruction to operate equipment.

  • “Let’s pull the China hat.”
  • “Check the Tigerflex for damage.”
  • “We need to repair this hose.”
  • “Who confirms the system is ready?”
  • “Has the flow been checked?”
  • “Can you confirm we’re ready?”

Four Finger Rule — Keep It Simple

WANT TO: “I want to understand how the uplift works.”

HAVE TO: “We have to fix the uplift.”

NEED TO: “We need to confirm the flow with the crew.”

MIGHT: “We might need to replace that hose.”

The job brings together problem solving, teamwork and an understanding of the farm’s equipment.

The Takeaway

The more you understand how the whole system fits together, the more useful you become. This is the kind of job that teaches you by making you watch, ask, help, and repeat.

Safety note: This article documents Colin’s working experience. Actual work follows the employer’s, vessel’s, farm’s and equipment’s procedures; this story is not a marine, aquaculture, lifting, diving or maintenance procedure.

The Four Finger Rule. Real life. Real conversations. Explore the Four Finger Rule.